1. Product Description
Product name: Top quality heat exchanger Water Cooling Block
Material | Plate | Aluminum alloy |
Dimension | Length | As per required |
Width | As per required | |
Height | As per required | |
Tolerance | Follows ISO2768 | |
Flatness | 0.05mm | |
Process | Bonding process | Epoxy bonding / Vacuum brazing |
Manufacturing process | CNC machining and bonding | |
Others | Surface finish | Mill finish, natural color and cleaning |
Cooling capacity | As per required | |
Packing way | Best suitable packing way | |
Application | Typically used in heat transfer fields | |
Certification | GB,SGS,ROHS,CE,etc. |
2.Products Show
The cold plate is the component of the liquid cooling system that interfaces with the heat source. Cold plates vary widely in complexity and construction depending on the application needs. A cold plate can be as simple as a copper tube attached to an aluminum plate or they can be extremely complex utilizing multiple technologies to achieve optimized heat transfer. These technologies can include high heat transfer fins, highly engineered micro or meso channels, or varied manufacturing processes such as vacuum, CAB, or dip brazing.
3.Analog Simulation Brief
4.Processing Equipment
5.Related Liquid Cooling Plates
6.Application
SEMICONDUCTORS & ELECTRONICS Medical Equipments
7.Our Company
9.Our Certifications
ISO9001:2008 , EN 15085-2 , PED certificate 97/23/CE , ISO 14001:2004 , OHSAS 18001:1999...
10.Packing & Delivery
FAQ
1.How can I get quotation and feedback for my products?
Provide your requirements and send to e-mail.
2.How long can I get the quotation?
Normally, we can provide instant feedback and then provide quotation within 48 hours
3.How long will you produce the parts?
Production lead time for CNC machining is 1-4wks, according to difference products and quantity. We will communicate with customers on production plan and delivery for each PO.
4.What's your payment terms?
1) Especially for new customers:50% T/T in advance, left needs to be wired before delivery.
2) L/C
5.Incoterms:
1) Ex-works or FOB Shanghai, is preferred;
2) CIF
6.Shipment: By Air or Ocean.
7.Will you sign NDA?
Yes, NDA is necessary between us.
Our Contact